IN-HOUSE CONSULTING & INTELLECTUAL PROPERTY RIGHTS (IPR)
IPR WorkShops/Webinars
I have organized and presented IPR Workshops/Webinars in different scenarios and in most of the EU-Funded Projects I have participated in as an In-House Consultant for the companies I provide my services to.
IPR in EU Programmes (FP7-H2020-Horizon Europe)
Intellectual Property Management in Horizon Europe
How to maximize the results of the Project.
IP and Contractual documents.
Trademarks, Copyrights, Patent, and others.
Deliverables on regulatory analysis, policy briefs, and intellectual property rights
The deliverables related to topics such as regulatory analysis, policy briefs, and intellectual property rights, among others, are specialized documents that go beyond the technical aspects of the project. I have been involved in drafting, reviewing, and assisting with more than 25 such deliverables across various projects, including:
Resseepe (GA #609377),
Greener (GA #826312),
Speedier (GA #847034)
HP4ALL (GA #891775)
Aligned (GA #101059430),
Remadyl (GA #821136)
Oleaf4Value (GA #101023256)
Nenu2phar (GA #887474), and others.
EU-PROJECT DELIVERABLES
These are some of the Deliverables I have been consulted on to draught, review, and/or assist with:
ECOBULK (GA #730456)
WP 7 - Task 7.5 Identification and assessment of Legal, Regulatory, Ethical, Environmental, and H&S Requirements.
(DELIVERABLE 7.6 Legal and Regulatory, Environmental, and Health and Safety Requirements).
LIGNIOX (GA #745246)
WP 4 - Task 4.5 Definition of European and local legal and non-legal limitations, barriers, and standards for using recovered lignin as plasticizers and dispersants.
(DELIVERABLES 4.5 - 4.6 - 4.7 European and local legal and non-legal limitations, barriers, and standards for LigniOx products).
SUNPILOT (GA #760915)
WP6 - TASK 6.5 Sustainability, user acceptance, and risks assessments.
(DELIVERABLE 6.5 Report on Regulation and Standardisation Issues).
VIPRISCAR (GA #790440)
WP7 - TASK 7.5 Definition of European and local legal and non-legal limitations, barriers, and standards.
(DELIVERABLES 7.8 - 7.9 - 7.10 European and local legal and non-legal limitations, barriers, and standards for VIPRISCAR products).
DEFACTO (GA #875247)
WP8 - TASK 8.3. IPR and Innovation Management.
(DELIVERABLES 8.3 - 8.4 - 8.5 Exploitation Strategy: Exploitation Plan, business plans, and IP management strategy).
ALIGNED (GA #101059430)
WP7 - Task 7.2. Exploitation and IPR management of project results
(DELIVERABLES 7.4. Exploitation and IPR Plan).
CATCO2NVERS (GA #101000580)
WP7 - Task 7.3. Regulatory analysis
(DELIVERABLE 7.3. White paper on carbon conversion technology including market and regulatory assessment).
REMADYL (GA #821136)
WP7 - Task 7.12. Policy Brief & Task 7.13. Policy & standardization input documents
(DELIVERABLE 7.12. Policy Brief).
(DELIVERABLE 7.13. Policy & Standardization input documents).
NENU2PHAR (GA #887474)
WP9 - Task 9.3. Exploitation Plan for NENU2PHAR’ Key Exploitable Results
Subtask 9.3.2. IPR and Innovation Management
(DELIVERABLE 9.11. Final Exploitation Plan).
OLEAF4VALUE (GA #101023256)
WP5 - Task 5.4. Task 5.4: Regulatory, legal, and beyond legal limitations
(DELIVERABLE 5.9. Final Report on the regulatory, legal, and safety analysis).
PROJECT MANAGEMENT
Work Package 6: Regulating framework and policies for the health, safety, and environmental risks for all proposed activities.
Participation in the development of the correspondent activities and Deliverable 6.3.
Work Package 7: Dissemination, Exploitation, and Business Planning.
Participation in Tasks 7.4 & 7.4 in the development of the correspondent activities and Deliverables 7.11 - 7.12 and 7.13.
Policy Brief & Collaboration in CREATOR Project.
Drafting, reviewing, and submitting of Remadyl Policy Brief.
Collaboration & partnership in the development of CREATOR Project's Policy Brief.
PM activities include, among others:
Work Package financial, operational, and/or administrative management.
Monthly project meetings & General Assembly attendance and participation.